Schedule overrun is one of the greatest hindrances to construction project performance, thereby making schedule management an integral part of construction project management. The aim of this study is to examine how the effect of sustainable energy management (SEM) and sustainable waste management (SWM) on schedule performance (SP) is mediated by technological complexity (TC) and moderated by project size (PS). Data were obtained by means of a questionnaire survey of 168 completed construction projects in Nigeria. The partial least squares structural equation modelling (PLS-SEM) technique was adopted in analysing the collected data. The results show that TC partially mediates the relationship between SWM and SP, while TC fully mediates the relationship between SEM and SP. Also, the findings of the study indicate that the negative effect of SWM on SP will be greater with large PS. This study contributes to previous studies in the area of schedule management, by providing empirical proof to explain the means through which SWM and SEM could lead to SP through TC, and how this would vary depending on PS. The study proffers ways for contractors to improve the SP of their projects considering PS and TC.
* Title and MeSH Headings from MEDLINE®/PubMed®, a database of the U.S. National Library of Medicine.