Displaying 1 publication

Abstract:
Sort:
  1. Zakwan, A K.A., Zuhra, A.K.A.
    MyJurnal
    Scheduling is one other method in productivity improvement. Scheduling occurs at the
    operation level of production planning and control system. Scheduling is important because it can
    optimize resource allocation and minimize waste. Simulation analysis can be used to evaluate the
    scheduling technique in order to determine the best alternatives. A case study company, Olilys Sdn.
    Bhd. Did are facing with the unsystematic scheduling methods for the job orders received from
    customers. The problem became worst during peak period (high demand) where the company unable
    to fulfil the customer orders. The objective of this project is to study the existing scheduling technique
    and find related problem, and propose an improvement in production scheduling system. In this project,
    there are five scheduling techniques proposed, which are First Come First Serve (FCFS), Shortest
    Processing Time (SPT), Longest Processing Time (LPT), Priority Rules by product sequences: By Part1
    and By Part 2, and Earliest Due Date (EDD). The simulation modelling and experimentation being
    done by using WITNESS simulation software. Through the experimentation analysis, the best
    scheduling technique was selected and suggested to the company
Related Terms
Filters
Contact Us

Please provide feedback to Administrator ([email protected])

External Links